
W10K Industrial Laser Power Probe
Cone-structure water-cooled high-power laser power probe for industrial fiber laser and CO2 laser measurement applications.
Models: W10K-PT-45 / W15K-PT-55
Reference comparison: Ophir 10K-W-BB-45 / 30K-W-BB-74
Request a Quote by EmailKey Features
Technical Specifications
| Models | W10K-PT-45 / W15K-PT-55 |
| Type | Cone-structure water-cooled industrial high-power probe |
| Power Range | W10K: 100 W - 10 kW; W15K: 100 W - 15 kW |
| Spectral Range | 0.8 - 2 µm, 10.6 µm |
| Resolution | 1 W |
| Measurement Uncertainty | < ±1% |
| Non-linearity | < ±2% |
| Accuracy | < ±5% |
| Response Time | W10K/W15K < 3 s |
| Aperture | W10K: 45 mm; W15K: 55 mm |
| Maximum Average Power Density | W10K: 3 kW/cm²; W15K: 6 kW/cm² |
| Cooling Water Flow | W10K: 8 - 10 L/min; W15K: 8 - 15 L/min |
| Interface / Cable | DB-9M; 5 m or 10 m cable |
Typical Applications
High-power fiber laser output measurement, CO2 laser measurement, laser cutting and welding systems, high-power industrial equipment acceptance and service applications.
Selection Notes
This series requires careful confirmation of water cooling, beam position, aperture, power density, laser safety and installation conditions. For 30kW-class applications, W30K-PT-80 can be discussed as an extended option.
Application and Ordering Questions
How do the 10kW and 15kW versions differ?
The published ranges are 100W–10kW and 100W–15kW, with 45 mm and 55 mm apertures respectively. Cooling flow and power-density limits also differ; compare the model-specific table rather than using rated power alone.
Is this a single continuous spectral range?
No. The listed coverage is 0.8–2 µm and 10.6 µm. Do not interpret this as continuous coverage from 0.8 to 10.6 µm. Confirm the laser wavelength and calibration requirement for your application.
Ordering, warranty and delivery
1-year warranty
Confirm the warranty scope and service procedure in your quotation.
Stock availability
Regular models are available from stock. Confirm the exact model and current stock with sales before ordering.
Factory dispatch
Production through factory dispatch typically takes about one week, subject to confirmation for your specific order.
Shipping time is additional
Transit time depends on the shipping method and destination. Shipping is arranged according to customer requirements; confirm the method and estimate with sales.
Calibration documentation
Calibration certificates accompany applicable measurement products. Confirm the instrument, calibration scope and document requirements before ordering.
Support in your language
We can communicate in your language and help confirm specifications and order details before purchase.